Ikitsuki Bridge

1.Field of application

Ikituki Br. in Nagasaki, Japan.

2.Circumstances of Repair

Fatigue crack was found at the panel point of the diagonal member in Dec.2009 after 19 years of service.

3.Types of structure

The outline of the bridge structure is as follows.

Photograph of Ikitsuki Br. is shown in Fig.1.

File not found: "ikitsuki_1.jpg" at page "M Bridge"[ź]

Fig.1 Ikitusuki Br.

4.Details of loading

Fluctuating loads due to wind load.

5.Description of damage

The fatigue crack was found by the visual inspection.The crack location and detail are shown in Fig.2,Fig.3.

File not found: "ikitsuki_2.jpg" at page "M Bridge"[ź]

Fig.2 Crack location.

File not found: "ikitsuki_3.jpg" at page "M Bridge"[ź]

Fig.3 Crack detail.

Cause of fatigue cracks was as follows:

6.Repair method applied

Firstly,stop-holes(φ=20mm)were drilled at the crack tips(Fig.4).

File not found: "ikitsuki_4.jpg" at page "M Bridge"[ź]

Fig.4 Stop hole.

Secondaty,bolted splice plates was installed on the web plat of the diagonal member(Fig.5).

File not found: "ikitsuki_5.jpg" at page "M Bridge"[ź]

Fig.5 Bolted splice plates.

Finaly,steel bars were tightened to moderate stresses(Fig.6).

File not found: "ikitsuki_6.jpg" at page "M Bridge"[ź]

Fig.6 Moderate stresses by tightened steel bar.

The original diagonal member was replaced with new one in May 2010. (Fig.7).

File not found: "ikitsuki_7.jpg" at page "M Bridge"[ź]

Fig.7 Completion view.

Reference

Kaneko Tetsuya,A study on the Retrofits of Ikitsuki Bridge,Kyushu Gihou,vol.48,2011.01(In Japanese)


トップ   新規 一覧 単語検索 最終更新   ヘルプ   最終更新のRSS