Other cases
のバックアップ(No.1)
[
トップ
] [
新規
|
一覧
|
単語検索
|
最終更新
|
ヘルプ
]
バックアップ一覧
差分
を表示
現在との差分
を表示
ソース
を表示
Other cases
へ行く。
1 (2014-02-07 (金) 12:21:55)
2 (2014-02-07 (金) 12:35:40)
3 (2014-03-31 (月) 09:29:03)
4 (2014-04-04 (金) 09:40:45)
5 (2014-04-04 (金) 16:33:48)
6 (2014-04-08 (火) 10:36:08)
7 (2014-04-15 (火) 09:37:55)
8 (2014-04-23 (水) 13:30:12)
Repair cases in Orthotropic Steel Bridge Deck
†
↑
1.Cases in Japan
†
Steel bridge on Hanshin Expressway (welded joints between vertical stiffeners and orthotropic deck plate)
:vertical stiffener cutting treating of the semicircle
Steel bridge on roadway bridge(intersection of bulb ribs and transverse rib)
:Bolted splice
Steel bridge on Hanshin Expressway (welded joint between longitudinal trough rib and orthotropic deck plate )
:Stop-hole and Replacement of the trough rib
Steel bridge on The Metropolitan Expressway(welded joint between longitudinal trough rib and deck plate )
:Stop-hole and SFRC pavement
Ohira viaduct of R-50(welded joint between longitudinal trough rib and deck plate )
:Stop-hole and SFRC pavement
Steel bridge on The Metropolitan Expressway(welded joint between longitudinal trough rib and deck plate )(Part 2)
:Stop-hole and Replacement of the trough rib
Shonan Br. of R-134(welded joint between longitudinal trough rib and deck plate )
:Reinforcing plate and SFRC pavement
Steel bridge on The Metropolitan Expressway(upper end of vertical stiffener at end diaphragm)
:Stop-hole