Mashita Bridge, Japan.

1.Field of application

Through-type Langer bridge on the roadway bridge, Japan.

2.Circumstances of Repair

Fatigue cracks were found at the joint of the vertical member and the tie girder.

3.Types of structure

This bridge is the through-type Langer bridge of which arch span length is 66m (Fig.1). The vertical members were H-type section and were weld connected to the top flange of the tie girders.

File not found: "Mashit26.gif" at page "Pedestrian Bridge"[ź]
Fig.1 Through-type Langer bridge.

4.Details of loading

Fluctuating loads due to wind load.

5.Description of damage

Fatigue cracks occurred in the joint of the vertical member and tie girder (Fig.2).The vertical members at the middle part of the bridge suffered the vibration due to wind of which speed was about 15 m/s. Cause of fatigue cracks is as follows. Vibration of the vertical members which was caused by Kerman's vortex.

File not found: "Mashit27.gif" at page "Pedestrian Bridge"[ź]
File not found: "Mashit28.gif" at page "Pedestrian Bridge"[ź]
Fig.2 Crack which occurred in the joint of the vertical member and tie girder.

6.Repair method applied

Emergency repair

Fracture part were pulled back by wire rope. To prevent the vibration of the vertical members, each vertical member were connected to the adjacent members by making use of logs.

Permanent repair

The modification of connection detail was performed so that the stress transfers smoothly to the web plate of the tie girder (Fig.3). The ground areas were checked by dye penetration. It was verified that no the crack tips remained.

File not found: "Mashit29.gif" at page "Pedestrian Bridge"[ź]
Fig.3 Retrofit work.