Steel bridge on Osaka-Kobe line of Hanshin Expressway, Japan.
Fatigue cracks were found in the flange-web welds of the cantilever brackets, which were used as a support of the sign poles, in Jul. 1984. The cracks was thought that had occurred after one to one and half years of service, because the cracked regions had exhibited significant corrosion.
The cross section is shown in figure 1. The base plates of the sign poles were directly bolt connected to the bracket flanges (Fig.2) and no bed plates existed on the bracket. The thickness of the bracket flange plates was 9mm.
File not found: "Hanko813.jpg" at page "Steel bridge on Hanshin Expressway (at floor-beam coped end)"[ź]
Fig.1 Cross section.
File not found: "Hanko814.jpg" at page "Steel bridge on Hanshin Expressway (at floor-beam coped end)"[ź]
Fig.2 Detail of the connection between the sign pole and the bracket.
Fluctuating loads due to highway live load.
Fatigue cracks occurred in the flange-web fillet welds of the cantilever brackets, which supported the sign poles (Fig.3,4). The cracks propagated along the bracket flange-web welds and reached the diaphragm locations. Some of them propagated into the bracket top flanges (Fig.5).
Cause of fatigue cracks was as follows:
- Vibration of the sign pole and the bracket due to vehicle pass and wind.
File not found: "Hanko815.jpg" at page "Steel bridge on Hanshin Expressway (at floor-beam coped end)"[ź]
Fig.3 Crack along the bracket flange-web weld.
File not found: "Hanko816.jpg" at page "Steel bridge on Hanshin Expressway (at floor-beam coped end)"[ź]
Fig.4 Crack along the bracket flange-web weld.
File not found: "Hanko817.jpg" at page "Steel bridge on Hanshin Expressway (at floor-beam coped end)"[ź]
Fig.5 Crack which propagated into the bracket top flange.
The original brackets were replaced with the new brackets of which the top flanges were full penetration groove weld connected with the webs (Fig.6). The new brackets had the bed plates, which were of 19mm thickness, on the flanges themselves (Fig.7). Also for the uncracked brackets, similar bed plates were inserted between the base plates of the sign poles and the bracket top flange plates.
File not found: "Hanko818.jpg" at page "Steel bridge on Hanshin Expressway (at floor-beam coped end)"[ź]
Fig.6 Detail of the bracket flange-web connection.
File not found: "Hanko819.jpg" at page "Steel bridge on Hanshin Expressway (at floor-beam coped end)"[ź]
Fig.7 Completion view.