Steel bridge on Hanshin Expressway (at gusset end)

1.Field of application

Steel bridge on Hanshin Expressway ,Japan.

2.Circumstances of Repair

Fatigue cracks were found in the gusset plate at the lower lateral bracing locations.

3.Types of structure

The bridge is composite I-section girder bridge of which span length is 34.3m (Fig.1). There are two kinds of joints in the cross bracings as shown in figure 2. The lower lateral bracings were fillet weld connected to the gusset plates.


File not found: "Hanko116.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]

Fig.1 Cross section.


File not found: "Hanko117.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]

Fig.2 Cantilever bracket which supports a sign pole.


File not found: "Hanko118.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]

Fig.3 Cantilever bracket which are connected to the box girder web.


4.Details of loading

Fluctuating loads due to highway live load.

5.Description of damage

Fatigue crack was found in the interior vertical stiffener end and at the bracket connection with the box girder web (Fig.4). The crack originated from the interior vertical stiffener end and was branched in three directions (Fig.5,6). The interior vertical stiffeners were not fillet weld connected to the box girder tension flanges.


Cause of fatigue cracks was thought as follows:



File not found: "Hanko119.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]

Fig.4 Crack location.


File not found: "Hanko120.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]

Fig.5 Crack of the vertical stiffener end.


File not found: "Hanko121.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]

Fig.6 Girder exterior view of the crack.


6.Repair method applied

Repair was performed as follows.

The box girder web of parts subjected to cracking was removed (Fig.7) and the plates were bolt connected from both sides of the box girder web (Fig.8,9). The interior of the box girder was reinforced as shown in figure 10.

File not found: "Hanko122.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]

Fig.7 Removal of the box girder web.


File not found: "Hanko123.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]


Fig.8 Strengthening of the bracket location.


File not found: "Hanko124.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]


Fig.9 Bolt splice.


File not found: "Hanko125.jpg" at page "Steel bridge on Hanshin Expressway (at gusset end)"[ź]


Fig.10 Interior view of the internal strengthening.



トップ   新規 一覧 単語検索 最終更新   ヘルプ   最終更新のRSS