Steel bridge on roadway bridge (at coped end) †
1.Field of application †
Steel bridge of The Metropolitan Expressway, Tokyo, Japan.;
2.Circumstances of repair †
Fatigue cracks at maingirder - floorbeam connection were found in 1974(after 10 years service).
3.Types of structure †
One through type girders(Fig.1)
File not found: "Shinkansen_MF_fig1.gif" at page "Steel bridge on roadway bridge (at coped end)"
[ź]
Fig.1
4.Details of loading †
Fluctuating loads due to Shinkansen trains traffic.
5.Description of damage and repair method applied †
File not found: "Shinka5.gif" at page "Steel bridge on roadway bridge (at coped end)"
[ź]
File not found: "Shinka1.gif" at page "Steel bridge on roadway bridge (at coped end)"
[ź]
File not found: "Shinka2.gif" at page "Steel bridge on roadway bridge (at coped end)"
[ź]
File not found: "Shinkansen_MF_fig5.gif" at page "Steel bridge on roadway bridge (at coped end)"
[ź]
File not found: "Shinka3.gif" at page "Steel bridge on roadway bridge (at coped end)"
[ź]
File not found: "Shinka4.gif" at page "Steel bridge on roadway bridge (at coped end)"
[ź]