Sample

Sample? (2014-03-20 (Thu) 05:40:08)

1.Field of application

Steel bridge of The Metropolitan Expressway, Tokyo, Japan.

2.Circumstances of repair

Fatigue cracks were found in the coped end of the plate girder in 1978 after 14 years of service.

3.Types of structure

The outline of the bridge structure is as follows.

Elevation and cross section are shown in figure 1. The number of the main girders which are spaced at 2.4 to 3.2 m and are seven. The main girders are deep at 1.8m and are coped at the ends.

File not found: "Copede1.jpg" at page "Contribution and Access free data base"[ź]
Fig.1 Elevation and cross section


4.Details of loading

Fluctuating loads due to highway live load.

5.Description of damage

Fatigue cracks were found in the coped end of the main girder and the swells of the girder webs also occurred in the girder ends due to buckling (Fig.2).

Cause of fatigue cracks was as follows:

6.Repair method applied

 Repair of parts subjected to cracking had been performed by stop hole and bolt connection as shown in figure 3. After completion of repair, inspection indicated that fatigue crack re-initiated from the stop hole. Therefore, additional repair and strengthening were required.

 New plates with the rib plates were bolt connected to both sides of the girder webs (Fig.4). This repair made the swell of the girder web reform. These new plates of 9mm thickness played the role of transmitting the load.

File not found: "Copede3.gif" at page "Contribution and Access free data base"[ź]
Fig.3 Primary repair.


File not found: "Copede4.gif" at page "Contribution and Access free data base"[ź]
Fig.4 Final repair




トップ   新規 一覧 単語検索 最終更新   ヘルプ   最終更新のRSS