M Bridge

1.Field of application

M Bridge in Tokyo, Japan.

2.Circumstances of Repair

The fatigue crack ,that length was 245mm, was found at the web panel of the end of the girder in the A2 support.

3.Types of structure

The outline of the bridge structure is as follows.

Elevation,plan and cross section of M bridge is shown in Fig.1.

M_bridge_1.jpg
M_bridge_2.jpg

Fig.1 Elevation,plan and cross section of M bridge.

4.Details of loading

Fluctuating loads due to vehicles live load.

5.Description of damage

The location and the detail of the crack are shown in Fig.2.Fig.3 shows the part which was surrounded in the lower flange,the end of diaphragm and the horizontal stiffener.This part corroded remarkably.The stagnant water was thought as the cause of the localized corrosion like this.As a result of having measured a residual thickness with a ultrasonic thickness gauge, it was revealed that the thinnest part was 1.8mm.

M_bridge_3.jpg

Fig.2 Location and detail of crack.
M_bridge_4.jpg

Fig.3 Corrosion in the box girder.

Causes of the fatigue crack were thought as follows:

6.Repair method applied

Bolted splice plates were installed(Fig.4,Fig.5).

M_bridge_5.jpg

Fig.4 Detail of the repair.
M_bridge_6.jpg

Fig.5 Photograph of the repair((a):The part of support.(b):Outer surface of the girder.(c):Inner surface of the girder.)

Reference

Chitoshi Miki,Fatigue and destruction of bridge,2011.10(In Japanese)