Steel Pier with Box section on The Metropokitan Expressway

1.Field of application

Steel pier at The Third line on The Metropokitan Expressway, Japan.

2.Circumstances of Repair

Fatigue cracks were found in welded joints ,which were the corner of the steel bridge pier,in 1997.

3.Types of structure

Front views of the steel piers are shown in Fig.1.

pier_shutoko_1.jpg

Fig.1 Front of the steel piers

4.Details of loading

Fluctuating loads due to highway live load.

5.Description of damage

One of these fatigue cracks location and detail are shown in Fig.2.

pier_shutoko_2.jpg

Fig.2 One of these fatigue cracks location and detail

Causes of fatigue cracks were as follows:

6.Repair method applied

As the temporally-repair,bolted splice plates(Fig.3,Fig.4) were installed on the box webs of the connections.This repairing decreased the measured stress by about 50%,so that these piers could be used safely temporally.But it was needed to remove all the fatigue cracks as the final repair.

pier_shutoko_3.jpg

Fig.3 Bolted splice plates

pier_shutoko_4.jpg

Fig.4 Construction photograph of bolted splice plates

Reference

Hisashi MORIKAWA,Tetsuhiro SHIMOZATO,Chitoshi MIKI and Atsushi ICHIKAWA,STUDY ON FATIGUE CRACKING IN STEEL BRIDGE PIERS WITH BOX SECTION AND TEMPORALLY REPAIRING,Journal of JSCE,No.703/I-59,pp177-183,2002.4(In Japanese)