*Ikitsuki Bridge [#m976cbec] *生月大橋 [#m976cbec] **1.Field of application [#u891c745] >Ikituki Br. in Nagasaki, Japan.&br; >生月大橋(長崎県).&br; **2.Circumstances of Repair [#bd6ac31d] >Fatigue crack was found at the panel point of the diagonal member in Dec.2009 after 19 years of service. >供用開始から19年が経過した2009年、斜材のボルト継手近傍で疲労き裂が見つかった。 **3.Types of structure [#m6e7a5fd] >The outline of the bridge structure is as follows. >橋梁の構造諸元は次のとおりである。 -Bridge length : 800.0 m -Span length : 200.0 + 400.0 + 200.0 m -Structure : Tree spans continuous througy-type truss bridge -Structure : Tree spans continuous through-type truss bridge -Structural steel : SS400,SM490Y,SM520,SM570 -橋長:800.0m -支間長:200+400+200m -橋梁形式:3径間連続下路トラス橋 -使用鋼材:SS400、SM490Y、SM520、SM570 >Photograph of Ikitsuki Br. is shown in [[Fig.1>#fig1]]. >[[図.1>#fig1]]に生月大橋の写真を示す。 CENTER:&aname(fig1);&attachref(./ikitsuki_1.jpg,30%);&br; &br; CENTER:Fig.1 Ikitusuki Br.&br; CENTER:図.1 生月大橋.&br; **4.Details of loading [#tf497e6d] >Fluctuating loads due to wind load. >風荷重 **5.Description of damage [#ua572d2b] >The fatigue crack was found by the visual inspection.The crack location and detail are shown in [[Fig.2>#fig2]],[[Fig.3>#fig3]]. &br; >目視点検により疲労き裂が見つかった。き裂の位置と詳細をそれぞれ[[図.2>#fig2]]、[[図.3>#fig3]]に示す. &br; CENTER:&aname(fig2);&attachref(./ikitsuki_2.jpg,30%);&br; &br; CENTER:Fig.2 Crack location. &br; CENTER:図.2 疲労き裂の位置 &br; CENTER:&aname(fig3);&attachref(./ikitsuki_3.jpg,30%);&br; &br; CENTER:Fig.3 Crack detail. &br; CENTER:図.3 き裂の詳細 &br; >Cause of fatigue cracks was as follows:&br; >疲労き裂の原因は以下のとおりである:&br; -Vibration of the diagonal member which was caused by wind. -風による斜材の振動 **6.Repair method applied [#vace2b9b] -Emergency repair -応急的処置 >Firstly,stop-holes(φ=20mm)were drilled at the crack tips([[Fig.4>#fig4]]). &br; >最初に、[[Fig.4>#fig4]]に示すとおり、疲労き裂の先端部にストップホール(φ=20mm)を施工した。 &br; CENTER:&aname(fig4);&attachref(./ikitsuki_4.jpg,30%);&br; &br; CENTER:Fig.4 Stop hole. &br; CENTER:図.4 ストップホール &br; >Secondaty,bolted splice plates was installed on the web plat of the diagonal member([[Fig.5>#fig5]]). &br; >次に[[図.5>#fig5]]に示すとおり、斜材にWEBに当て板補強を行い高力ボルトで固定した。 &br; CENTER:&aname(fig5);&attachref(./ikitsuki_5.jpg,30%);&br; &br; CENTER:Fig.5 Bolted splice plates. &br; CENTER:図.5 当て板補強 &br; >Finaly,steel bars were tightened to moderate stresses([[Fig.6>#fig6]]). &br; >最後に鋼棒に張力を導入した([[図.6>#fig6]]). &br; CENTER:&aname(fig6);&attachref(./ikitsuki_6.jpg,30%);&br; &br; CENTER:Fig.6 Moderate stresses by tightened steel bar. &br; CENTER:図.6 鋼棒への張力導入 &br; -Permanent repair -恒久的処置 >The original diagonal member was replaced with new one in May 2010. ([[Fig.7>#fig7]]). &br; >2010年5月、損傷した斜材は新しいものに取り替えられた。 &br; CENTER:&aname(fig7);&attachref(./ikitsuki_7.jpg,30%);&br; &br; CENTER:Fig.7 Completion view. &br; CENTER:図.7 取替えが完了した状態 &br; **Reference [#jfcdb670] >Kaneko Tetsuya,A study on the Retrofits of Ikitsuki Bridge,'''Kyushu Gihou''',vol.48,2011.01(In Japanese) &br;