*Ohira viaduct of R-50(welded joint between longitudinal trough rib and deck plate ) [#q894f1e0] *国道50号大平高架橋(トラフリブと鋼床版デッキプレートの溶接継手)[#q894f1e0] **1.Field of application [#db7748d9] >Ohira viaduct of R-50 in Tochigi, Japan.&br; >国道50号 大平高架橋(栃木県).&br; >国道50号大平高架橋(栃木県).&br; **2.Circumstances of repair [#g0837b2d] >Fatigue cracks were detected on welded joints between longitudinal trough rib and orthotropic deck plate after over 20 years of service.&br; >供用開始から20年以上が経過したのち、トラフリブとデッキプレート間の溶接継手部に疲労き裂が見つかった.&br; **3.Types of structure [#t5ab761b] >The outline of the bridge structure is as follows.&br; >橋梁諸元は次のとおりである.&br; -Bridge length : 147.0m, -Span length :40m+56m+50m&br; -Structure : Box girder bridge with orthotropic deck system -Deck plate thickness : 12mm -橋長: 147.0m -支間長: 40+56+50m -構造形式:鋼床版箱桁橋 -デッキ厚:12mm >The cross section is shown in [[Fig.1>#fig1]]. &br; >断面は[[Fig.1>#fig1]]に示すとおりである. &br; CENTER:&aname(fig1);&attachref(./ohira_cross_section.jpg,30%);&br; &br; CENTER:Fig.1 Cross section &br; &br; CENTER:Fig.1 断面形状 &br; CENTER:図.1 断面形状 &br; &br; **4.Details of loading [#j4fa5952] >Fluctuating loads due to vehicles live load. &br; >活荷重 &br; **5.Description of damage [#o6944d36] >The fatigue cracks were detected on welded joints between longitudinal trough ribs and orthotropic deck plates. &br; &br; >トラフリブとデッキプレート間の溶接継手部において、疲労き裂が見つかった。 >Cause of fatigue cracks was as follows:&br; >疲労き裂の原因は以下のとおりである。 -Localized stress concentration which resulted from the out-of-plane of the deck plate deflection due to the wheel load. -輪荷重載荷によるデッキプレートの面外方向たわみに起因する局所的は応力集中 **6.Repair method applied [#w9ccc48b] >Emergency repair &br; >応急的処置 &br; >Stop holes were drilled at the crack tips([[Fig.2>#fig2]]). &br; >き裂先端部にストップホールを施工した([[Fig.2>#fig2]]). CENTER:&aname(fig2);&attachref(./ohira_stop_hole.jpg,25%);&br; &br; CENTER:Fig.2 Stop hole &br; &br; CENTER:Fig.2 ストップホール &br; CENTER:図.2 ストップホール &br; &br; >Permanent repair &br; >恒久的処置 &br; >The SFRC pavements were constructed on the orthotropic deck plates instead of asphalt pavements.([[Fig.3>#fig3]],[[Fig.4>#fig4]],[[Fig.5>#fig5]],).And the change of the driving lane was carried out to move a wheel position and a fatigue damage point. &br; >アスファルト舗装に代えて、SFRC舗装を施工した([[Fig.3>#fig3]],[[Fig.4>#fig4]],[[Fig.5>#fig5]],).疲労損傷を受けた部分が輪荷重走行位置から外れるようにレーン配置を変更した。 CENTER:&attachref(./ohira_sfrc_1.jpg,40%);&br; &br; CENTER:Fig.3 The typical cross-section of SFRC &br; &br; CENTER:Fig.3 SFRC断面(一般部) &br; CENTER:図.3 SFRC断面(一般部) &br; &br; &br; CENTER:&attachref(./ohira_sfrc_2.jpg,40%);&br; &br; CENTER:Fig.4 The state of the construction of the adhesive &br; &br; CENTER:Fig.4 接着剤の施工状況 &br; CENTER:図.4 接着剤の施工状況 &br; &br; &br; CENTER:&attachref(./ohira_sfrc_3.jpg,40%);&br; &br; CENTER:Fig.5 The standard cross section of the SFRC pavements &br; &br; CENTER:Fig.5 SFRC舗装の断面(一般部) &br; CENTER:図.5 SFRC舗装の断面(一般部) &br; &br; //**Reference [#g41f0ed2] //>実橋鋼床版き裂補修部におけるSFRC補強前後の応力計測結果 //>実橋における既設鋼床版へのSFRC補強効果確認計測 &br;