*Steel bridge on roadway bridge (at coped end)(part 2). [#d3cee161]

**1.Field of application [#g2845920]

>Steel bridge of The Hanshin Expressway, Japan.&br;

**2.Circumstances of repair [#l907e4b7]

>Fatigue cracks were found in the coped end of the plate girder in 1981 after 13 years of service.&br;

**3.Types of structure [#f1bee619]
>The outline of the bridge structure is as follows.&br;
-Bridge length : 50.0m
-Span length : 49.3 m
-Structure : Simple composite plate girder bridge.
-Deck : Reinforced concrete deck ( 17.0 cm thickness )
-Structural steel : SS 41 

>Elevation and cross section are shown in [[figure 1>#fig1]]. The number of the main girders which are deep at 2.2 m are six.  
&br;
&br;
CENTER:&aname(fig1);&attachref(copede21.gif);&br;
&br;
CENTER:Fig.1 Elevation and cross section &br;
&br;
&br;
**4.Details of loading [#f4d304ad]
>Fluctuating loads due to highway live load.

**5.Description of damage [#b5c844ff]
>Fatigue cracks were found in the coped ends of the main girders ([[Fig.2>#fig2]]). As a result, fatigue cracks were also found in the coped end for some other bridges with the same structure.
&br;
>Cause of fatigue cracks was as follows:&br;
-Concentration of stress unforeseen in design.
&br;
&br;
CENTER:&aname(fig2);&attachref(copede22.jpg);&br;
&br;
&br;
CENTER:&aname(fig2);&attachref(copede4.jpg);&br;
&br;
CENTER:Fig.2 Crack location &br;
&br;
&br;

**6.Repair method applied [#z13a7d7e]
>Repair and strengthening of parts subjected to cracking were performed by full penetration weld and bolt connection with rib plates ([[Fig.3>#fig3]]). 