*Case 2.H [#tea03e9e]
**The causes of fatigue [#k6635851]
>
An inappropriate structural detail had been adopted.
**Approaches to repairing and retrofitting [#ua32fe4a]
>
modification of connection detail.
>
**LINK [#e8628019]
-[[51.4 Bridge]]
>
Bolt splice
-[[Deck-type two hinge arch Br.]]
>
stop hole and bolt splice and pin connection.
-[[Shemimaru Bridge of Meishin Expressway]]
>
Addition of the members
-[[Deck-type Langer bridge on roadway bridge]]
>
knee bracing and flange connection
-[[Minato-Shin bridge of R-23]]
>
stop hole and addition of truss structure
-[[Steel bridge on roadway bridge (at coped end)]]
>
Stop hole and Bolt splice
-[[Steel bridge on roadway bridge (at coped end) (Part 2)]]
>
Reweld and Bolt splice
-[[Gerber bridge on roadway bridge:
>
Stop hole and Reweld and Bolt splice
-[[Gerber bridge on roadway bridge (Part 2)]]
>
Reweld and Bolt splice
-[[King Street Bridge]]
>
Pre-stress with steel cables
-[[Haseltalbrucke Bridge]]
>
Re-welding, Cover plate and Truss structure
-[[Fremont Bridge]]
>
Web modification
-[[Steel bridge on Hanshin Expressway (at gusset end)]]
>
Replacement and Angle connection
終了行:
*Case 2.H [#tea03e9e]
**The causes of fatigue [#k6635851]
>
An inappropriate structural detail had been adopted.
**Approaches to repairing and retrofitting [#ua32fe4a]
>
modification of connection detail.
>
**LINK [#e8628019]
-[[51.4 Bridge]]
>
Bolt splice
-[[Deck-type two hinge arch Br.]]
>
stop hole and bolt splice and pin connection.
-[[Shemimaru Bridge of Meishin Expressway]]
>
Addition of the members
-[[Deck-type Langer bridge on roadway bridge]]
>
knee bracing and flange connection
-[[Minato-Shin bridge of R-23]]
>
stop hole and addition of truss structure
-[[Steel bridge on roadway bridge (at coped end)]]
>
Stop hole and Bolt splice
-[[Steel bridge on roadway bridge (at coped end) (Part 2)]]
>
Reweld and Bolt splice
-[[Gerber bridge on roadway bridge:
>
Stop hole and Reweld and Bolt splice
-[[Gerber bridge on roadway bridge (Part 2)]]
>
Reweld and Bolt splice
-[[King Street Bridge]]
>
Pre-stress with steel cables
-[[Haseltalbrucke Bridge]]
>
Re-welding, Cover plate and Truss structure
-[[Fremont Bridge]]
>
Web modification
-[[Steel bridge on Hanshin Expressway (at gusset end)]]
>
Replacement and Angle connection