Case 4.H
をテンプレートにして作成
[
トップ
] [
新規
|
一覧
|
単語検索
|
最終更新
|
ヘルプ
]
開始行:
*Case 4.H [#eb337193]
**The causes of fatigue [#v5072168]
>
The structure behaved in a manner not expected such as due to vibration.
**Approaches to repairing and retrofitting [#yce350d0]
>
modification of connection detail
>
**LINK [#k73fa8e7]
-[[Arcreal MYST, vibration due to wind]]
>
Re-welds and bolted splice
-[[Shinkansen Br. (ends of vertical stiffener)]]
>
Stop hole + adding plate with rib
-[[I-84]]
>
Plate removal
-[[Commodore John J. Barry Bridge]]
>
Cable addition and Damper
-[[Steel bridge with hangers and pinned connections]]
>
Replacement
-[[Steel bridge on Hanshin Expressway (at cantilever bracket)]]
>
Replacement of the bracket
-[[Shitoku-Ohashi]]
>
Plate connection and Spiraling the trip wire
-[[Steel bridge with eyebar-pin connections]]
>
Covering the new member
-[[Mashita Bridge]]
>
Plate connection
-[[Through-type Langer bridge on the roadway bridge]]
>
Re-welding and installation of rib and device
終了行:
*Case 4.H [#eb337193]
**The causes of fatigue [#v5072168]
>
The structure behaved in a manner not expected such as due to vibration.
**Approaches to repairing and retrofitting [#yce350d0]
>
modification of connection detail
>
**LINK [#k73fa8e7]
-[[Arcreal MYST, vibration due to wind]]
>
Re-welds and bolted splice
-[[Shinkansen Br. (ends of vertical stiffener)]]
>
Stop hole + adding plate with rib
-[[I-84]]
>
Plate removal
-[[Commodore John J. Barry Bridge]]
>
Cable addition and Damper
-[[Steel bridge with hangers and pinned connections]]
>
Replacement
-[[Steel bridge on Hanshin Expressway (at cantilever bracket)]]
>
Replacement of the bracket
-[[Shitoku-Ohashi]]
>
Plate connection and Spiraling the trip wire
-[[Steel bridge with eyebar-pin connections]]
>
Covering the new member
-[[Mashita Bridge]]
>
Plate connection
-[[Through-type Langer bridge on the roadway bridge]]
>
Re-welding and installation of rib and device
ページ名: