*Steel Pier with Box section on The Metropolitan Expressway [#g5f05733]
*首都高速道路の鋼製橋脚 [#g5f05733]
**1.Field of application [#r15ae1ab]
>Steel pier at The Third line on The Metropolitan Expressway, Japan.&br;
>首都高速道路3号線の鋼製橋脚.&br;
**2.Circumstances of Repair [#m6160cd1]
>Fatigue cracks were found in welded joints ,which were the corner of the steel bridge pier,in 1997.
>1997年、箱断面鋼製橋脚の隅角部の溶接継手に疲労き裂が見つかった。
**3.Types of structure [#k979f13d]
>Front views of the steel piers are shown in [[Fig.1>#fig1]].
&br;
>[[図.1>#fig1]]に鋼製橋脚の正面図を示す.&br;
CENTER:&aname(fig1);&attachref(./pier_shutoko_1_R1.jpg,15%);&br;
&br;
CENTER:Fig.1 Front of the steel piers
&br;
CENTER:図.1 正面図
&br;
**4.Details of loading [#s818a3f2]
>Fluctuating loads due to highway live load.
>活荷重
**5.Description of damage [#y00eaa5f]
>One of these fatigue cracks location and detail are shown in [[Fig.2>#fig2]].
&br;
>[[図.2>#fig2]]に、疲労き裂(抜粋)の位置と詳細を示す。
&br;
CENTER:&aname(fig2);&attachref(./pier_shutoko_2.jpg,20%);&br;
&br;
CENTER:Fig.2 One of these fatigue cracks location and detail
&br;
CENTER:図.2 疲労き裂の位置と詳細
&br;
>Causes of fatigue cracks were as follows:
>疲労き裂の原因は次のとおりである。
-Lack of fusion in the double bevel groove type welded joint which connected the transverse beam flange to the colum flange.
-Large cyclic stress due to live load.
-横梁と柱のフランジ間の両開先溶接部の溶け込み不足
-活荷重による高い繰り返し応力
**6.Repair method applied [#me675e4d]
>As the temporally-repair,bolted splice plates([[Fig.3>#fig3]]) were installed on the box webs of the connections.This repairing decreased the measured stress by about 50%,so that these piers could be used safely temporally.But it was needed to remove all the fatigue cracks as the final repair.
&br;
>応急的処置として、([[図.3>#fig3]])に示すとおり、WEBの当て板補強を行い高力ボルトで固定した。この当て板補強により、約50%の応力低減となり、安全に供用できる状態となった。
CENTER:&aname(fi3);&attachref(./pier_shutoko_3.jpg,20%);&aname(fi4);&attachref(./pier_shutoko_4.jpg,40%);&br;
CENTER:Fig.3 Bolted splice plates and Construction photograph of bolted splice plates
&br;
CENTER:図.3 当て板補強とその施工状況
&br;
**Reference [#b370504a]
>Hisashi MORIKAWA,Tetsuhiro SHIMOZATO,Chitoshi MIKI and Atsushi ICHIKAWA,STUDY ON FATIGUE CRACKING IN STEEL BRIDGE PIERS WITH BOX SECTION AND TEMPORALLY REPAIRING,'''Journal of JSCE''',No.703/I-59,pp177-183,2002.4(In Japanese)
&br;
終了行:
*Steel Pier with Box section on The Metropolitan Expressway [#g5f05733]
*首都高速道路の鋼製橋脚 [#g5f05733]
**1.Field of application [#r15ae1ab]
>Steel pier at The Third line on The Metropolitan Expressway, Japan.&br;
>首都高速道路3号線の鋼製橋脚.&br;
**2.Circumstances of Repair [#m6160cd1]
>Fatigue cracks were found in welded joints ,which were the corner of the steel bridge pier,in 1997.
>1997年、箱断面鋼製橋脚の隅角部の溶接継手に疲労き裂が見つかった。
**3.Types of structure [#k979f13d]
>Front views of the steel piers are shown in [[Fig.1>#fig1]].
&br;
>[[図.1>#fig1]]に鋼製橋脚の正面図を示す.&br;
CENTER:&aname(fig1);&attachref(./pier_shutoko_1_R1.jpg,15%);&br;
&br;
CENTER:Fig.1 Front of the steel piers
&br;
CENTER:図.1 正面図
&br;
**4.Details of loading [#s818a3f2]
>Fluctuating loads due to highway live load.
>活荷重
**5.Description of damage [#y00eaa5f]
>One of these fatigue cracks location and detail are shown in [[Fig.2>#fig2]].
&br;
>[[図.2>#fig2]]に、疲労き裂(抜粋)の位置と詳細を示す。
&br;
CENTER:&aname(fig2);&attachref(./pier_shutoko_2.jpg,20%);&br;
&br;
CENTER:Fig.2 One of these fatigue cracks location and detail
&br;
CENTER:図.2 疲労き裂の位置と詳細
&br;
>Causes of fatigue cracks were as follows:
>疲労き裂の原因は次のとおりである。
-Lack of fusion in the double bevel groove type welded joint which connected the transverse beam flange to the colum flange.
-Large cyclic stress due to live load.
-横梁と柱のフランジ間の両開先溶接部の溶け込み不足
-活荷重による高い繰り返し応力
**6.Repair method applied [#me675e4d]
>As the temporally-repair,bolted splice plates([[Fig.3>#fig3]]) were installed on the box webs of the connections.This repairing decreased the measured stress by about 50%,so that these piers could be used safely temporally.But it was needed to remove all the fatigue cracks as the final repair.
&br;
>応急的処置として、([[図.3>#fig3]])に示すとおり、WEBの当て板補強を行い高力ボルトで固定した。この当て板補強により、約50%の応力低減となり、安全に供用できる状態となった。
CENTER:&aname(fi3);&attachref(./pier_shutoko_3.jpg,20%);&aname(fi4);&attachref(./pier_shutoko_4.jpg,40%);&br;
CENTER:Fig.3 Bolted splice plates and Construction photograph of bolted splice plates
&br;
CENTER:図.3 当て板補強とその施工状況
&br;
**Reference [#b370504a]
>Hisashi MORIKAWA,Tetsuhiro SHIMOZATO,Chitoshi MIKI and Atsushi ICHIKAWA,STUDY ON FATIGUE CRACKING IN STEEL BRIDGE PIERS WITH BOX SECTION AND TEMPORALLY REPAIRING,'''Journal of JSCE''',No.703/I-59,pp177-183,2002.4(In Japanese)
&br;